Acturadar.comFrance in real time

Detected on Saturday 31 October, 08h07

Hyères: Building permits for 4-star hotel annulled by justice

The Marseille Administrative Court of Appeal annuls the building permits issued in 2019 and 2022 for a 4-star hotel on the port of Hyères. The developer intends to continue his project.

In brief

Justice event (severity: low) in Hyères (Var), first detected on 31 October 2026 at 08:07. Reported by 1 source (1 article), last updated on 31 October 2026 at 08:07.

·
Category
Justice
Severity
Low
Place
83 VarHyères
Detected
31 Oct, 08h07
Updated
31 Oct, 08h07
Reference
no.5587
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 08h07
    Nice-MatinCentreWire31 Oct
    Pour un palmier, les permis de construire d’un hôtel 4 étoiles sur six niveaux qui doit être implanté sur le port de Hyères sont annulés par la justice

    Les deux permis de construire délivrés par la ville en 2019 et en 2022 à la société Les Voiliers ont été annulés par la Cour administrative d’appel de Marseille. Mais le promoteur compte bien voir aboutir son projet d’hôtel 4 étoiles sur le site de l’ancien yacht-club sur le port de Hyères.

03

Further reading

Places cited

Keywords

#permis de construire · #hôtel · #Hyères

Go up the thread

Affected departments