Detected on Saturday 31 October, 08h07
Hyères: Building permits for 4-star hotel annulled by justice
The Marseille Administrative Court of Appeal annuls the building permits issued in 2019 and 2022 for a 4-star hotel on the port of Hyères. The developer intends to continue his project.
In brief
Justice event (severity: low) in Hyères (Var), first detected on 31 October 2026 at 08:07. Reported by 1 source (1 article), last updated on 31 October 2026 at 08:07.
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 08h07Nice-MatinCentreWire31 OctPour un palmier, les permis de construire d’un hôtel 4 étoiles sur six niveaux qui doit être implanté sur le port de Hyères sont annulés par la justice
Les deux permis de construire délivrés par la ville en 2019 et en 2022 à la société Les Voiliers ont été annulés par la Cour administrative d’appel de Marseille. Mais le promoteur compte bien voir aboutir son projet d’hôtel 4 étoiles sur le site de l’ancien yacht-club sur le port de Hyères.
Further reading
Organisations cited
Keywords
#permis de construire · #hôtel · #Hyères
Go up the thread
Affected departments
People and organisations cited