Story no.379OngoingTransportInfoTarn-et-Garonne6 Nov → 6 Nov2 facts · 2 art.
Montauban: the western urban boulevard, consultation and residents' concerns
Summary being written…
In brief
Ongoing story bringing together 2 events in Tarn-et-Garonne, followed from 6 November 2026 to 6 November 2026. 2 articles from 1 source (transport); last updated on 6 November 2026 at 13:01.
2 articles of rated outlets · 1 source (2 art.) · 1 bord sur 3 · outlets: left 1, centre 0, right 0
Angle comparison for the whole story
A comparison is written as soon as the story is covered by at least two sides (left, centre, right).
Timeline
newest firstOutlets:LeftCentreRightUncategorised· badge = severity
- 13h01
LatestMontauban: residents along west urban boulevard worried about noise pollution
In Montauban, residents along section No. 2 of the west urban boulevard, whose inauguration is scheduled for November 10, are worried about noise from the construction site and then from traffic.
La Dépêche du MidiCentre-left
- 08h01
Montauban: final public meeting on the western urban boulevard
Le Grand Montauban held the final public meeting of the public consultation on sections 4 and 5 of the western urban boulevard, a bypass project for the urban area.
La Dépêche du MidiCentre-left
In figures
Affected departments
82 Tarn-et-GaronneReported toll
No numeric assessment in the articles.
Further reading
Organisations cited
Places cited
Go up the thread
Events in the story
Affected departments