Story no.1084OngoingSecuritySeriousLandes +320 Nov → 23 Nov6 facts · 108 art.
Miro G cargo ship grounded on the Landes coast: developments
Summary being written…
In brief
Ongoing story bringing together 6 events in 4 departments (Landes, Gironde, Pyrénées-Atlantiques and 1 more), followed from 20 November 2026 to 23 November 2026. 108 articles from 30 sources (security); last updated on 23 November 2026 at 21:18. Reported toll: 2 injured, 11 arrests.
Landes
Photo Jibi44 · CC BY-SA 3.0 · Wikimedia Commons89 articles of rated outlets · 19 unrated outside the bar · 30 sources (108 art.) · the three sides talk about it · outlets: left 5, centre 16, right 2
Angle comparison for the whole story
All three sides report the grounding of the Miro G, the evacuation of part of the crew, and towing difficulties related to weather. The left focuses more on rescue operations, technical constraints, and maritime authorities' monitoring, while the center and right emphasize the complex or prolonged nature of the refloating and risks to the ship.
Left
Headlines and excerpts emphasize helicopter evacuation, the number of people on board or airlifted, weather vigilance, and the role of rescue services. They also stress "technical prerequisites," the swell, strong winds, and the goal of preventing the ship from capsizing.
Centre
Coverage emphasizes the urgency of stabilizing the ship, the search for a "weather window," the role of the tugboat Abeille Bretagne, and possible towing timelines. Several excerpts describe a "perilous" or "high-risk" operation, with precise time markers on the progress of attempts.
Right
Articles mainly stress "technical and weather constraints," the possible towing duration, and orange weather vigilance in the Landes. They also mention the cargo ship's drift against the swell and winds, as well as the evacuation of part of the crew.
Written by an AI from headlines and extracts only of all events in the story · 23 Nov, 02h48
Confirmed by several sources(10)
- 14
The Miro G ran aground in Lit-et-Mixe, in the Landes.
14 independent sourcesici.fr, Europe 1, Ouest-France, L'Est Républicain, Le Dauphiné libéré +18
- 11
The Miro G is a Maltese-flagged bulk carrier.
11 independent sourcesEurope 1, Ouest-France, L'Est Républicain, Le Dauphiné libéré, Le Progrès +14
- 5
The Miro G ran aground in the night of November 19 to 20.
5 independent sourcesL'Est Républicain, Le Dauphiné libéré, Le Progrès, Le Bien Public, Actu.fr +5
- 5
Nineteen sailors were winched out by helicopter during the first evacuation.
5 independent sourcesici.fr, L'Union, Libération, France 3 Régions, Midi Libre +1
- 5
Eleven people were winched out by helicopter on Saturday, November 21.
5 independent sourcesLibération, BFMTV / RMC, La République des Pyrénées, TF1 Info / LCI, franceinfo
- 5
The ship is 169 meters long and was built in 2011.
5 independent sourcesL'Est Républicain, Le Dauphiné libéré, Le Progrès, Le Bien Public, L'Union +4
- 4
The Miro G was heading to Rouen and was expected on November 23.
4 independent sourcesici.fr, HuffPost France, Libération, Paris-Normandie
- 3
Twenty-two people were on board the cargo ship.
3 independent sourcesici.fr, L'Union, Paris-Normandie, Le Parisien
- 3
The 22 sailors on board were declared safe and sound.
3 independent sourcesL'Union, Le Parisien, L'Obs
- 2
The ship was empty of cargo and contained about a hundred tonnes of diesel fuel.
2 independent sourcesL'Union, franceinfo
Sources disagree(1)
Date of the grounding
- Friday, November 20according to Ouest-France, La Croix, France 3 Régions, Midi Libre
- Friday, November 29according to Midi Libre
Updates(6)
- 23 Nov, 09h22Maritime authorities hope for a weather window on Tuesday to attempt to refloat the ship.
- 23 Nov, 09h22The tugboat Abeille Bretagne is expected on site but cannot approach within 900 meters.
- 23 Nov, 09h22The ship moved slightly on November 21 under the effect of the tide.
- 22 Nov, 15h20Towing: hope for a quick operation replaced by a forecast of several days.
- 22 Nov, 15h20Casualty count for people on board: 22 sailors declared safe and sound.
- 22 Nov, 15h20Evacuation: 19 sailors winched out by helicopter, then 11 others on November 21.
AI cross-check of the headlines and extracts of 57 articles (28 outlets) · “confirmed” = reported by at least two independent outlets · 23 Nov, 12h53
Timeline
newest firstOutlets:LeftCentreRightUncategorised· badge = severity
- 21h18
LatestThe stranded Miro G cargo ship in the Landes could be refloated
Conditions appear to be in place to attempt to free the cargo ship stranded on the coast of the Landes. The refloating operation remains under surveillance after several days of preparations.
Le ParisienCentre
- 18h50
Préparatifs du déséchouage du cargo Miro G dans les Landes
Les préparatifs de la manœuvre de déséchouage du vraquier Miro G se sont poursuivis le 23 novembre. Plusieurs aléas rendent l'opération incertaine et nécessitent une coordination renforcée.
Sud OuestCentre
- 21h32
Cargo échoué dans les Landes : la ministre pointe la responsabilité de l’armateur
La ministre de la Mer Catherine Chabaud a estimé que le cargo échoué sur le littoral landais n’aurait jamais dû prendre la mer. La veille, 11 personnes ont été hélitreuillées avant la nuit en raison des conditions météorologiques.
TF1 Info / LCICentrefranceinfoUncategorised
- 14h05
Opération de stabilisation du cargo échoué Miro G dans les Landes
Après l'évacuation des derniers membres d'équipage, les opérations autour du cargo Miro G se compliquent avec le vent et la houle. Les autorités cherchent désormais à stabiliser le navire avant d'envisager de le remettre à flot.
La République des PyrénéesUncategorisedTF1 Info / LCICentre
In figures
Affected departments
Multiple departments (4)
Reported toll
- 2
- injured
- 11
- interpellations
Highest number recorded in 3 article(s), automatically extracted: please check sources.
Further reading
Organisations cited
Go up the thread
Events in the story
- The stranded Miro G cargo ship in the Landes could be refloated23 Nov
- Préparatifs du déséchouage du cargo Miro G dans les Landes23 Nov
- Cargo runs aground on Landes coast, part of crew evacuated23 Nov
- Cargo échoué dans les Landes : la ministre pointe la responsabilité de l’armateur22 Nov
- Opération de stabilisation du cargo échoué Miro G dans les Landes22 Nov
- Ship strandings: retrospective on the Aquitaine coast since 194620 Nov
Affected departments