EnvironmentSeverity 2 out of 5: Low20 hours ago
Cagnes-sur-Mer: construction site exceeded pumping thresholds for four months
The prefecture has halted pumping at a construction site in Cagnes-sur-Mer after a "massive exceedance" of withdrawals, with the aquifer becoming saline.
06Cagnes-sur-Mer1 art. · 1 src.