Detected on Tuesday 3 November, 15h52
Foundation stone laid for Suippes fire and rescue center
The foundation stone of the new Suippes fire and rescue center was laid, in the presence of departmental council president Jean-Marc Roze.
In brief
Security event (severity: info) in Suippes (Marne), first detected on 3 November 2026 at 15:52. Reported by 1 source (2 articles), last updated on 3 November 2026 at 15:52.
2 articles · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 2 articles, 1 source
- 15h45L'UnionCentreWire3 NovL’historique
Lecture zen 17 novembre 2022 vers 13 h 30 : des vents violents frappent la commune, la caserne de Suippes est touchée novembre 2025 : le Sdis, qui assure la maitrise d’ouvrage de travaux, annonce le lancement des travaux au printemps 2026 août 2026 : le chantier démarre et devrait durer un an et deux mois Mis en ligne le 3/11/2026 à 15:41 L’historique
- 15h52L'UnionCentreWire3 Nov« Le symbole visible d’un engagement collectif » : la première pierre du centre de secours de Suippes a été posée
Lecture zen « On ne dira jamais assez le courage et l’abnégation déployés quotidiennement par nos pompiers professionnels et volontaires », a notamment déclaré Jean-Marc Roze, le président du conseil départemental. - Adriane Carroger « Par la pose de cette première pierre, nous marquons une étape décisive dans la vie du centre d’incendie et de secours de Suippes . Cette cérémonie est le symbole visible d’un engagement collectif, celui de tout un département envers celles et ceux qui chaque jour et chaque nuit veillent sur notre sécurité », a souligné Philippe Salmon, président du conseil d’adm
Further reading
People cited
Organisations cited
Places cited
Keywords
#Suippes · #pompiers · #centre de secours · #caserne · #travaux
Go up the thread
Affected departments
People and organisations cited