Detected on Tuesday 3 November, 14h30
Mirepoix bridge rebuilt seven years after collapse
Seven years after the collapse of the bridge that caused the deaths of two people, reconstruction work on a 150-meter structure has begun.
In brief
Transport event (severity: low) in Mirepoix (Ariège), first detected on 3 November 2026 at 14:30. Reported by 1 source (2 articles), last updated on 3 November 2026 at 17:30. Reported toll: 2 deaths.
2 articles · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 2 articles, 1 source
- 14h30TF1 Info / LCICentreWirevia TF1 Info3 NovSept ans après, les travaux commencent enfin
Dans le Tarn, les habitants espèrent enfin pouvoir tourner la page du drame de Mirepoix, quand le pont s'était effondré il y a sept ans, causant la mort de deux personnes et révélant les problèmes de vétusté de nombreux autres ouvrages dans notre pays. Aujourd'hui, les travaux de reconstruction du pont sont lancés, un ouvrage de 150 mètres qui doit relier deux rives et mettre fin à des détours de sept kilomètres. Rarement, un village n'aura été si content d'entendre les bruits de chantier et d'enfin voir les pelleteuses en action.
- 17h30TF1 Info / LCICentreWirevia TF1 Info3 Nov"Ça va permettre au village de revivre" : 7 ans après le drame, les travaux du pont de Mirepoix démarrent dans le Tarn
Les travaux de reconstruction du pont de Mirepoix, effondré en novembre 2019 et qui avait causé la mort de deux personnes, ont débuté. Ce chantier de 19 mois doit permettre de relier à nouveau les deux rives et de mettre fin à sept kilomètres de détour pour les habitants.
Further reading
Reported toll
- 2
- morts
Highest number recorded in 2 article(s), automatically extracted: please check sources.
Keywords
#pont · #reconstruction · #Mirepoix
Go up the thread
Affected departments