Acturadar.comFrance in real time

Detected on Monday 2 November, 21h35

Level crossing failure: rail traffic heavily disrupted between Toulouse and Pau

On Monday evening, a failure affecting several level crossings strongly disrupted train circulation between Toulouse and Pau. Some trains were delayed by up to 2 hours and 45 minutes.

In brief

Transport event (severity: low) in 3 departments (Haute-Garonne, Pyrénées-Atlantiques, Hautes-Pyrénées), first detected on 2 November 2026 at 21:35. Reported by 1 source (1 article), last updated on 2 November 2026 at 21:35.

·
Category
Transport
Severity
Low
Detected
2 Nov, 21h35
Updated
2 Nov, 21h35
Reference
no.7574
01

Who is covering it, and from what angle

Method
1Left

1 article · 1 source · 1 bord sur 3 · outlets: left 1, centre 0, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 21h35
    La Dépêche du MidiCentre-leftWire2 Nov
    Jusqu'à 2 h 45 de retard pour certains trains entre Toulouse et Pau : la panne de plusieurs passages à niveau entraîne de grosses perturbations sur la circulation ferroviaire

    Lundi soir, le trafic ferroviaire entre Toulouse et Pau est fortement perturbé en raison d'une panne affectant plusieurs passages à niveau sur cette ligne. Les trains en provenance de Lourdes ou Boussens accusent...

03

Further reading

Keywords

#SNCF · #passages à niveau · #retards