Acturadar.comFrance in real time

Detected on Monday 2 November, 17h32

Ittenheim: the after-school care construction project is progressing, opening expected in 2027

The Ittenheim after-school care construction project, a €5 million project capable of accommodating 172 children, has entered its interior fitting-out phase for an opening in September 2027.

In brief

Society event (severity: info) in Ittenheim (Bas-Rhin), first detected on 2 November 2026 at 17:32. Reported by 1 source (1 article), last updated on 2 November 2026 at 17:32.

·
Category
Society
Severity
Info
Place
67 Bas-RhinIttenheim
Detected
2 Nov, 17h32
Updated
2 Nov, 17h32
Reference
no.7304
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 17h32
    Dernières Nouvelles d'AlsaceCentreWire2 Nov
    Ittenheim. Un projet de 5 millions d'euros : le périscolaire a bien poussé, les aménagements intérieurs lancés

    Débutée il y a environ un an, la construction du périscolaire d’Ittenheim se poursuit avec le second œuvre. Le site, qui bénéficie d’importants espaces extérieurs, aura une capacité d’accueil de 172 enfants. Il devrait ouvrir en septembre 2027.

03

Further reading

Reported toll

Amounts cited5 millions d'euros

Highest number recorded in 1 article(s), automatically extracted: please check sources.

Places cited

Keywords

#périscolaire · #construction · #Bas-Rhin

Go up the thread

Affected departments