Detected on Monday 2 November, 08h37
Oullins-Pierre-Bénite: traffic reorganization at La Bussière
Roadworks began on October 19 at La Bussière to streamline the route and secure areas around schools, until the end of the week.
In brief
Transport event (severity: info) in Oullins-Pierre-Bénite (Rhône), first detected on 2 November 2026 at 08:37. Reported by 1 source (1 article), last updated on 2 November 2026 at 08:37.
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 08h37BFMTV / RMCCentreWirevia BFMTV – Info en continu2 NovOullins-Pierre-Bénite : la circulation repensée à la Bussière
Les travaux ont commencé le 19 octobre et vont s’étaler jusqu’à la fin de la semaine. Objectif : fluidifier l’axe tout en préservant la sécurité aux abords des bâtiments scolaires.
Further reading
Go up the thread
Affected departments