Detected on Saturday 31 October, 15h13
Draisy: SNCF and Lohr battery-powered light train could run as early as 2029
Draisy, the lightweight battery-powered train developed by SNCF and Lohr and supported by France 2030, could run as early as 2029 on small lines in Grand Est and Occitanie.
In brief
Transport event (severity: low), first detected on 31 October 2026 at 15:13. Reported by 1 source (1 article), last updated on 31 October 2026 at 15:13.
- Category
- Transport
- Severity
- Low
- Place
- Not geolocated
- Detected
- 31 Oct, 15h13
- Updated
- 31 Oct, 15h13
- Reference
- no.5853
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 15h13BFMTV / RMCCentreWirevia BFMTV – Info en continu31 OctDraisy pèse et coûte moitié moins qu'un TER: le train "poids plume" à batterie de la SNCF et de Lohr pourrait circuler dès 2029 sur les petites lignes du Grand Est et d'Occitanie
Inclus dans le programme France 2030, soutenu par l'Etat à travers l'Ademe et bénéficiant d'une enveloppe de 12,8 millions d'euros, ce train léger et sur batterie a vocation à se substituer à des trains au diesel qui vont être retirés de petites lignes d'ici 2030/2035.
Further reading
Reported toll
Amounts cited12,8 millions d'euros
Highest number recorded in 1 article(s), automatically extracted: please check sources.
Keywords
#train batterie · #SNCF · #France 2030
Go up the thread