Acturadar.comFrance in real time

Detected on Saturday 31 October, 15h13

Draisy: SNCF and Lohr battery-powered light train could run as early as 2029

Draisy, the lightweight battery-powered train developed by SNCF and Lohr and supported by France 2030, could run as early as 2029 on small lines in Grand Est and Occitanie.

In brief

Transport event (severity: low), first detected on 31 October 2026 at 15:13. Reported by 1 source (1 article), last updated on 31 October 2026 at 15:13.

·
Category
Transport
Severity
Low
Place
Not geolocated
Detected
31 Oct, 15h13
Updated
31 Oct, 15h13
Reference
no.5853
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 15h13
    BFMTV / RMCCentreWirevia BFMTV – Info en continu31 Oct
    Draisy pèse et coûte moitié moins qu'un TER: le train "poids plume" à batterie de la SNCF et de Lohr pourrait circuler dès 2029 sur les petites lignes du Grand Est et d'Occitanie

    Inclus dans le programme France 2030, soutenu par l'Etat à travers l'Ademe et bénéficiant d'une enveloppe de 12,8 millions d'euros, ce train léger et sur batterie a vocation à se substituer à des trains au diesel qui vont être retirés de petites lignes d'ici 2030/2035.

03

Further reading

Reported toll

Amounts cited12,8 millions d'euros

Highest number recorded in 1 article(s), automatically extracted: please check sources.

Organisations cited

Places cited

Keywords

#train batterie · #SNCF · #France 2030

Go up the thread

People and organisations cited