Detected on Saturday 31 October, 09h00
Nice: extension of avenue Grinda bike path
Work on the future avenue Grinda bike path, between avenue Henri-Matisse and the former Nice Saint-Augustin station, has begun. It is to be inaugurated in December, with traffic changes in the meantime.
In brief
Transport event (severity: info) in Nice (Alpes-Maritimes), first detected on 31 October 2026 at 09:00. Reported by 1 source (1 article), last updated on 31 October 2026 at 09:00.
- Category
- Transport
- Severity
- Info
- Place
- 06 Alpes-MaritimesNice
- Detected
- 31 Oct, 09h00
- Updated
- 31 Oct, 09h00
- Reference
- no.5624
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 09h00Nice-MatinCentreWire31 Oct« Elle s’arrêtait au milieu de nulle part » : une piste cyclable de l’ouest de Nice va être prolongée et opérationnelle en décembre
Les travaux de la future piste cyclable située avenue Grinda, entre l’avenue Henri-Matisse et l’ancienne gare de Nice Saint-Augustin, ont débuté. Elle doit être inaugurée en décembre. En attendant, la circulation va être légèrement modifiée.
Further reading
Keywords
#piste cyclable · #travaux · #Nice
Go up the thread
Affected departments