Detected on Saturday 31 October, 07h02
Canal bridge works: traffic disrupted between Péronne and Cléry for three months
The Péronne-Albert road will be regularly cut off at Cléry-sur-Somme from November 5 to February 8, 2027 due to work on the future canal bridge.
In brief
Transport event (severity: info) in Cléry-sur-Somme (Somme), first detected on 31 October 2026 at 07:02. Reported by 1 source (1 article), last updated on 31 October 2026 at 07:02.
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 07h02Paris-NormandieCentreWire31 OctFutur pont-canal : des difficultés de circulation à prévoir entre Péronne et Cléry pendant trois mois
L’axe Péronne – Albert sera régulièrement coupé, jusqu’à 15 minutes, à hauteur de Cléry-sur-Somme, du 5 novembre au 8 février 2027. - (Infographie Canal Seine-Nord Europe). Mis en ligne le 31/10/2026 à 07:02 Lecture zen I l y a déjà eu des travaux d’enfouissement en profondeur d’un réseau de gaz le long de la D930 entre Nesle et Rouy-le-Petit ; la déviation de l’A2 à Ytres, au nord de Péronne , pour permettre la construction d’un viaduc ; la construction d’un quai de déchargement sur le canal du Nord à Allaines , ou la modification du tracé d’une voie communale entre Allaines et Bouchavesnes-B
Further reading
Organisations cited
Keywords
#travaux · #circulation · #pont-canal · #Somme
Go up the thread
Affected departments
People and organisations cited