Detected on Friday 30 October, 15h25
Couvrot: New RN44 roundabout to open progressively from November 9
Safety improvement work on the RN44 at Couvrot is entering its third phase, with the new roundabout opening progressively from November 9.
In brief
Transport event (severity: info) in Couvrot (Marne), first detected on 30 October 2026 at 15:25. Reported by 1 source (1 article), last updated on 30 October 2026 at 15:25.
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 15h25L'UnionCentreWire30 OctCouvrot : le nouveau giratoire de la RN44 progressivement ouvert à la circulation dès le 9 novembre
Lecture zen Les travaux de construction du rond-point vont bon train. - Archives Engagés depuis le 15 juin 2026, les travaux d’aménagement de sécurité sur la RN44, à hauteur de Couvrot, entrent dans leur troisième phase. Ce chantier, destiné à sécuriser et à améliorer les conditions de circulation sur cet axe, prévoit notamment la création d’un giratoire, la mise aux normes de l’assainissement et la suppression de certains accès afin de fluidifier les déplacements. À lire aussi PHOTOS. Découvrez le chantier du futur giratoire de Couvrot de l’intérieur À partir du lundi 9 novembre, cette nouvel
Further reading
Go up the thread
Affected departments