Acturadar.comFrance in real time

Detected on Thursday 29 October, 10h17

Bourguignon-sous-Montbavin: renovation of town hall square

Renovation work on the town hall square of Bourguignon-sous-Montbavin has begun, after the reconstruction of the washhouse roof. The roadway was in very poor condition.

In brief

Society event (severity: info) in Bourguignon-sous-Montbavin (Aisne), first detected on 29 October 2026 at 10:17. Reported by 1 source (1 article), last updated on 29 October 2026 at 10:17.

·
Category
Society
Severity
Info
Place
02 AisneBourguignon-sous-Montbavin
Detected
29 Oct, 10h17
Updated
29 Oct, 10h17
Reference
no.3703
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 10h17
    L'UnionCentreWire29 Oct
    Un nouveau visage pour la place de la mairie de Bourguignon-sous-Montbavin

    Lecture zen Fin de la première semaine, les travaux sont à la mi-temps. Depuis longtemps considérée comme une priorité, la reconstruction du toit du lavoir a fini par être réalisée. Se hissait alors tout en haut de la pile, le dossier réfection de la place. « Très dégradé, le revêtement d’enrobés ne dissimulait pas sa vétusté. Il était même devenu dangereux pour les personnes qui venaient à la mairie et pour les élèves de l’école qui lui est adjacente et qui en font un terrain de jeu ou de déambulation tels les collégiens et lycéens guettant les cars de ramassage scolaire. C’est d’ailleurs en

03

Further reading

Keywords

#travaux · #mairie · #Aisne

Go up the thread

Affected departments