Acturadar.comFrance in real time
Judicial liquidation of Apollonia and project for site preservation

Ongoing2 events · of the 24 Nov au 28 Nov · latest fact at 17h01

View entire story

Fact 2 of 2 in the story · Saturday 28 November, 17h01

Strasbourg: Vetter and CEA propose including Apollonia in triennial contract

Following the liquidation of the Apollonia association, Jean-Philippe Vetter and the CEA propose studying the inclusion of a new project to preserve the site in the Strasbourg triennial contract.

In brief

Politics event (severity: notable) in Strasbourg (Bas-Rhin), first detected on 28 November 2026 at 17:01. Reported by 1 source (1 article), last updated on 28 November 2026 at 17:01. Part of the story “Judicial liquidation of Apollonia and project for site preservation”.

·
Strasbourg

Strasbourg

Photo Radek Kucharski · CC BY 2.0 · Wikimedia Commons
Category
Politics
Severity
Notable
Place
67 Bas-RhinStrasbourg
Detected
28 Nov, 17h01
Updated
28 Nov, 17h01
Reference
no.36500
01

What changed in the story at that point

02

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

03

Lire les sources · 1 article, 1 source

Publication order
  1. 17h01
    Dernières Nouvelles d'AlsaceCentreWire28 Nov
    Strasbourg. Vetter et la CEA proposent d’inscrire le projet Apollonia au contrat triennal

    La liquidation de l’association Apollonia incite les politiques à sortir du bois. Après la clarification de la position de la Ville, c’est au tour du conseiller d’Alsace Jean-Philippe Vetter (LR) et de la CEA d’ouvrir des perspectives pour la préservation du site, en proposant d’étudier l’inscription du (nouveau) projet au contrat triennal Strasbourg, capitale européenne.

04

Further reading

Organisations cited

Places cited

Keywords

#Apollonia · #contrat triennal · #Strasbourg