Acturadar.comFrance in real time

Detected on Saturday 28 November, 11h11

Saint-André-de-l’Eure: first building of school campus under construction

The leisure center is the first structure of the vast school campus project led by the City of Saint-André-de-l’Eure to be built. Its delivery is scheduled for mid-2027.

In brief

Social event (severity: low) in Saint-André-de-l’Eure (Eure), first detected on 28 November 2026 at 11:11. Reported by 1 source (1 article), last updated on 28 November 2026 at 11:11.

·
Category
Social
Severity
Low
Place
27 EureSaint-André-de-l’Eure
Detected
28 Nov, 11h11
Updated
28 Nov, 11h11
Reference
no.36191
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 11h11
    Paris-NormandieCentreWire28 Nov
    Centre de loisirs à Saint-André-de-l’Eure : le premier bâtiment du campus sort de terre

    Le centre de loisirs devrait être livré mi-2027. Mis en ligne le 28/11/2026 à 11:11 Lecture zen D ans le vaste projet de construction d’un campus scolaire porté par la Ville de Saint-André-de-l’Eure, l’accueil de loisirs est la première structure à sortir de terre. Consultez l’actualité en vidéo La construction de l’accueil de loisirs va permettre d’augmenter sensiblement le nombre de places par rapport à l’ancienne structure, qui passera de 60 à 120 places. Accès sécurisé « Il y aura une entrée commune pour l’accueil de loisirs et les structures scolaires. Un accès va être créé entre le châte

03

Further reading

Keywords

#centre de loisirs · #campus scolaire · #construction

Go up the thread

Affected departments

People and organisations cited