Acturadar.comFrance in real time

Detected on Thursday 29 October, 07h45

Toulon: new footbridge planned for 2028 at l'Escaillon

The project for a structure spanning the railway line on the l'Escaillon side is due to be completed in 2028, to the relief of local residents.

In brief

Transport event (severity: info) in Toulon (Var), first detected on 29 October 2026 at 07:45. Reported by 1 source (1 article), last updated on 29 October 2026 at 07:45.

·
Category
Transport
Severity
Info
Place
83 VarToulon
Detected
29 Oct, 07h45
Updated
29 Oct, 07h45
Reference
no.3605
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 07h45
    Nice-MatinCentreWire29 Oct
    « On l’attend depuis 25 ans » : une nouvelle passerelle va faciliter la vie des habitants de ce quartier de Toulon

    Le projet d’ouvrage enjambant la voie ferrée du côté de l’Escaillon devrait finalement voir le jour en 2028. Un soulagement pour les riverains, qui attendent tout de même de voir enfin sa concrétisation.

03

Further reading

Places cited

Keywords

#passerelle · #Toulon · #travaux

Go up the thread

Affected departments