Detected on Thursday 29 October, 06h06
Saint-Simon: work underway to replace bridge
The bridge replacement project over the canal in Saint-Simon lasts one year, with a detour put in place for traffic.
In brief
Transport event (severity: info) in Saint-Simon, first detected on 29 October 2026 at 06:06. Reported by 1 source (1 article), last updated on 29 October 2026 at 06:06.
- Category
- Transport
- Severity
- Info
- Place
- Not geolocatedSaint-Simon
- Detected
- 29 Oct, 06h06
- Updated
- 29 Oct, 06h06
- Reference
- no.3447
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 06h06Paris-NormandieCentreWire29 OctSpectaculaire intervention à Saint-Simon pour le changement du pont
Pendant un an, la durée du chantier, il n’est plus possible de passer au-dessus du canal. Une déviation a été mise en place. Mis en ligne le 29/10/2026 à 06:06 Lecture zen Il devait arriver ce mercredi 28 octobre à 9 heures, finalement le premier camion n’est arrivé que peu avant midi après quelques péripéties. Il faut dire qu’on ne transporte pas un monstre de près de 40 tonnes et de plus de trente mètres de long comme un colis ordinaire. « Le transporteur avait fait un repérage du trajet mais il y a un endroit où finalement ça ne passait pas, ils ont dû changer d’itinéraire », indique Michel
Further reading
Go up the thread
People and organisations cited