Acturadar.comFrance in real time

English translation in progress — this text is still shown in French.

Landslides and roads cut off in the Southeast

Ongoing9 events · of the 9 Nov au 26 Nov · latest fact at 12h01

View entire story

Fact 9 of 9 in the story · Thursday 26 November, 12h01

Savoie : la RD1212 rouvre dans les gorges de l'Arly

La route départementale 1212 dans les gorges de l'Arly rouvre à la circulation le jeudi 26 novembre à 15 heures. Cette réouverture concerne les usagers de la Savoie.

In brief

Transport event (severity: low) in Gorges de l'Arly (Savoie), first detected on 26 November 2026 at 12:01. Reported by 1 source (1 article), last updated on 26 November 2026 at 12:01. Part of the story “Landslides and roads cut off in the Southeast”.

·
Savoie

Savoie

Photo Florian Pépellin · CC BY-SA 3.0 · Wikimedia Commons
Category
Transport
Severity
Low
Place
73 SavoieGorges de l'Arly
Detected
26 Nov, 12h01
Updated
26 Nov, 12h01
Reference
no.33867
01

What changed in the story at that point

02

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

03

Lire les sources · 1 article, 1 source

Publication order
  1. 12h01
    Le Dauphiné libéréCentreWire26 Nov
    Savoie. La route des gorges de l’Arly rouvre ce jeudi 26 novembre à 15 heures

    Bonne nouvelle pour les usagers de la RD1212, les gorges de l’Arly rouvriront à la circulation ce jeudi 26 novembre à 15 heures.

04

Further reading