Fact 2 of 2 in the story · Wednesday 25 November, 20h23
RER B closed several times in 2027 for works
Several closure dates for the RER B in 2027 have been announced, notably at Mitry-Claye and Massy-Palaiseau. Users will have to cope with interruptions on different sections of the line.
In brief
Transport event (severity: notable) in 6 departments (Paris, Seine-et-Marne, Essonne and 3 more), first detected on 25 November 2026 at 20:23. Reported by 1 source (1 article), last updated on 25 November 2026 at 20:23. Part of the story “RER A and RER B: closures planned for 2027 for works”.
- Category
- Transport
- Severity
- Notable
- Place
- RER B
Multiple departments (6)
- Detected
- 25 Nov, 20h23
- Updated
- 25 Nov, 20h23
- Reference
- no.33108
What changed in the story at that point
RER A interrupted for several weeks in 2027 for works
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 20h23Le ParisienCentreWire25 NovRER B : Mitry-Claye, Massy-Palaiseau… Toutes les dates des fermetures pour travaux en 2027
Further reading
In the same story
On the same subject
Affected departments