Detected on Tuesday 24 November, 18h56
Le Teil: train station to reopen in August 2027 with links to Nîmes
Le Teil station is set to reopen in August 2027, for the first time since 1973, with 5 to 7 daily connections to Nîmes. This reopening is a first step before the full reopening of the right bank of the Rhône.
In brief
Transport event (severity: low) in 2 departments (Ardèche, Gard), first detected on 24 November 2026 at 18:56. Reported by 1 source (1 article), last updated on 24 November 2026 at 18:56.
Ardèche
Photo GIRAUD Patrick · CC BY-SA 3.0 · Wikimedia Commons- Category
- Transport
- Severity
- Low
- Place
- gare du Teil
Multiple departments (2)
- Detected
- 24 Nov, 18h56
- Updated
- 24 Nov, 18h56
- Reference
- no.31912
1 article · 1 source · no rated outlet covers this topic yet (public service, agencies, official accounts…)
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 18h56France 3 RégionsWire24 Nov"Ça va faire revivre Le Teil" : après 54 ans d'absence, le train va enfin revenir en Ardèche
Pour la première fois depuis 1973, des voyageurs pourront à nouveau monter dans un train en Ardèche. La gare du Teil doit rouvrir en août 2027, avec 5 à 7 liaisons quotidiennes vers Nîmes. Une première étape avant la réouverture complète de la rive droite du Rhône.
Further reading
Places cited
Keywords
#train · #Ardèche · #gare du Teil · #réouverture
Go up the thread