Acturadar.comFrance in real time

Detected on Tuesday 24 November, 16h13

Photovoltaic park expected in 2027 in Beauchamps

The photovoltaic park project at the exit of Beauchamps is led by Soledra, a subsidiary of the Lhotellier group. The building permit was granted in August 2024, and studies and funding are being finalized.

In brief

Environment event (severity: low) in Beauchamps, first detected on 24 November 2026 at 16:13. Reported by 1 source (1 article), last updated on 24 November 2026 at 16:13.

·
Category
Environment
Severity
Low
Place
Not geolocatedBeauchamps
Detected
24 Nov, 16h13
Updated
24 Nov, 16h13
Reference
no.31224
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 16h13
    Paris-NormandieCentreWire24 Nov
    Le parc photovoltaïque attendu pour 2027

    Mis en ligne le 24/11/2026 à 16:12 Lecture zen Le projet de parc photovoltaïque, à la sortie de Beauchamps, est porté par Soledra, filiale du groupe Lhotellier. Interrogé sur le sujet, celui-ci rappelle que le permis de construire avait été déposé en octobre 2023 et accordé en août 2024. « Les études et le financement sont en phase de finalisation pour un début de construction prévu au cours du premier semestre 2027 », indique la société. Ce parc occupera huit hectares au total, les anciens bassins de la sucrerie, et « permettra de produire plus de 8000 megawatts heure par an, soit la consomma

03

Further reading

Organisations cited

Places cited

Keywords

#photovoltaïque · #Beauchamps · #Soledra

Go up the thread

People and organisations cited