Detected on Sunday 22 November, 12h00
Haute-Saône: Suez plans to extend its hazardous waste plant by 21 hectares
The Suez plant in Vaivre-et-Montoille - Pusey currently treats 75,000 tonnes of hazardous waste per year. The group plans a 21-hectare extension to increase its capacity in response to rising volumes delivered due to regulatory changes.
In brief
Environment event (severity: notable) in Vaivre-et-Montoille, Pusey (Haute-Saône), first detected on 22 November 2026 at 12:00. Reported by 1 source (1 article), last updated on 22 November 2026 at 12:00.
Vaivre-et-Montoille
Photo Michiel1972 · CC BY-SA 3.0 · Wikimedia Commons- Category
- Environment
- Severity
- Notable
- Place
- 70 Haute-SaôneVaivre-et-Montoille, Pusey
- Detected
- 22 Nov, 12h00
- Updated
- 22 Nov, 12h00
- Reference
- no.28636
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 12h00L'Est RépublicainCentreWire22 NovHaute-Saône. Suez : un projet d’extension sur 21 hectares pour pérenniser les activités
Alors qu’elle peut actuellement traiter 75 000 tonnes de déchets dangereux par an, l’usine Suez de Vaivre-et-Montoille - Pusey va devoir s’étendre. Les récentes évolutions réglementaires en matière de transition énergétique font que les quantités livrées sont de plus en plus importantes, poussant l’antenne haut-saônoise à augmenter sa capacité de traitement à 100 000 tonnes.
Further reading
Organisations cited
Places cited
Keywords
#déchets dangereux · #extension industrielle · #Haute-Saône
Go up the thread
Affected departments
People and organisations cited