Detected on Sunday 22 November, 06h31
CO2 capture and burial project in Martres-Tolosane
The Martres-Tolosane cement plant is preparing a 600 million euro investment to capture and bury CO2 emitted by the plant, with 35 km of pipelines and 1,500 meters depth. A public debate is to be launched on November 30.
In brief
Environment event (severity: notable) in Martres-Tolosane (Haute-Garonne), first detected on 22 November 2026 at 06:31. Reported by 1 source (1 article), last updated on 22 November 2026 at 06:31.
Haute-Garonne
Photo Traumrune · CC BY-SA 3.0 · Wikimedia Commons- Category
- Environment
- Severity
- Notable
- Place
- 31 Haute-GaronneMartres-Tolosane
- Detected
- 22 Nov, 06h31
- Updated
- 22 Nov, 06h31
- Reference
- no.28452
1 article · 1 source · 1 bord sur 3 · outlets: left 1, centre 0, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 06h31La Dépêche du MidiCentre-leftWire22 Nov35 km de canalisations, 1 500 mètres de profondeur... le projet de capture du CO2 au sud de la Haute-Garonne prend une dimension titanesque
La cimenterie de Martres-Tolosane dans le Comminges prépare un investissement massif de 600 M€ pour capter et enfouir le CO2 émis par l’usine. Le débat public sera lancé le 30 novembre.
Further reading
Reported toll
Amounts cited600 M€
Highest number recorded in 1 article(s), automatically extracted: please check sources.
Places cited
Keywords
#CO2 · #captage · #Haute-Garonne
Go up the thread
Affected departments