Acturadar.comFrance in real time

Detected on Sunday 22 November, 07h51

Toulouse Swimming City will not be ready by the scheduled date

The building permit for the Swimming City was issued in May, but the construction site will not start in 2026 as planned. The future Olympic pool, which will bear the name of Léon Marchand, is planned on Ramier Island.

In brief

Society event (severity: low) in Toulouse (Haute-Garonne), first detected on 22 November 2026 at 07:51. Reported by 1 source (1 article), last updated on 22 November 2026 at 07:51.

·
Toulouse

Toulouse

Photo Tonio94 ( talk · contribs ) · CC BY-SA 2.5 · Wikimedia Commons
Category
Society
Severity
Low
Place
31 Haute-GaronneToulouse
Detected
22 Nov, 07h51
Updated
22 Nov, 07h51
Reference
no.28446
01

Who is covering it, and from what angle

Method
1Left

1 article · 1 source · 1 bord sur 3 · outlets: left 1, centre 0, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 07h51
    La Dépêche du MidiCentre-leftAnalysis22 Nov
    DECRYPTAGE. Future piscine Léon Marchand : pourquoi la Cité de la natation à Toulouse, ne se fera finalement pas prête à la date espérée

    EXCLUSIF. Le permis de construire a été délivré en mai, mais le chantier de la Cité de la natation ne démarrera pas en 2026 comme prévu. Sur l’île du Ramier, où le futur bassin olympique portera le nom de Léon...

03

Further reading

People cited

Organisations cited

Keywords

#Toulouse · #piscine · #retard · #Léon Marchand

Go up the thread

Affected departments

People and organisations cited