Acturadar.comFrance in real time

Detected on Friday 20 November, 07h03

Auch: foundation stone for hospital rehabilitation and extension project

Health Minister Stéphanie Rist laid Thursday, November 19 the foundation stone for the rehabilitation and extension project of Auch hospital center. The project is financed by the Ségur de la Santé.

In brief

Health event (severity: notable) in Auch (Gers), first detected on 20 November 2026 at 07:03. Reported by 1 source (1 article), last updated on 20 November 2026 at 07:03.

·
Stéphanie Rist

Stéphanie Rist

Photo Antoine Lamielle · CC BY-SA 4.0 · Wikimedia Commons
Category
Health
Severity
Notable
Place
32 GersAuch
Detected
20 Nov, 07h03
Updated
20 Nov, 07h03
Reference
no.26240
01

Who is covering it, and from what angle

Method
1Left

1 article · 1 source · 1 bord sur 3 · outlets: left 1, centre 0, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 07h03
    La Dépêche du MidiCentre-leftWire20 Nov
    "Les engagements sont tenus" : à l'hôpital d'Auch, la ministre de la Santé Stéphanie Rist pose la première pierre du projet de réhabilitation et d'extension

    La première pierre du projet de réhabilitation et d'extension du centre hospitalier d'Auch a été posée jeudi 19 novembre, en présence de la ministre de la Santé, Stéphanie Rist. Financé par le Ségur de la Santé, ce...

03

Further reading

People cited

Organisations cited

Places cited

Keywords

#hôpital · #Auch · #réhabilitation

Go up the thread

Affected departments

People and organisations cited