Detected on Friday 20 November, 07h05
Toulon: redevelopment work on Avenue Maréchal-de-Lattre-de-Tassigny advances
The redevelopment work on Avenue Maréchal-de-Lattre-de-Tassigny, between Mayol stadium and Le Mourillon, continues in Toulon. The construction site of over 6 million euros should be completed before summer.
In brief
Transport event (severity: low) in Toulon (Var), first detected on 20 November 2026 at 07:05. Reported by 1 source (1 article), last updated on 20 November 2026 at 07:05.
Toulon
Photo Rafi88 · CC BY-SA 4.0 · Wikimedia Commons1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 07h05Nice-MatinCentreWire20 Nov« On a six mois d’avance » : ce chantier de voirie à plus de 6 millions d’euros devrait être achevé avant l’été à Toulon
Les travaux de requalification de l’avenue Maréchal-de-Lattre-de-Tassigny, entre le stade Mayol et le quartier du Mourillon, avancent à un rythme soutenu. On fait le point.
Further reading
Reported toll
Amounts cited6 millions d’euros
Highest number recorded in 1 article(s), automatically extracted: please check sources.
Places cited
Keywords
#voirie · #travaux · #Toulon
Go up the thread
Affected departments