Detected on Friday 20 November, 06h30
Nancy: Saint-Dizier Street will be closed for three years starting April 2027
The Nancy metropolitan area has begun discussions with residents on the redevelopment of Saint-Dizier Street. The construction work is scheduled to start in April 2027 and the street will be closed along its entire length for nearly three years.
In brief
Transport event (severity: low) in Nancy (Meurthe-et-Moselle), first detected on 20 November 2026 at 06:30. Reported by 1 source (1 article), last updated on 20 November 2026 at 06:30.
Nancy
Photo Parsifall · CC BY-SA 3.0 · Wikimedia Commons- Category
- Transport
- Severity
- Low
- Place
- 54 Meurthe-et-MoselleNancy
- Detected
- 20 Nov, 06h30
- Updated
- 20 Nov, 06h30
- Reference
- no.26145
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 06h30L'Est RépublicainCentreWire20 NovNancy. Futur chantier rue Saint-Dizier : les échanges ont commencé, la rue fermée en totalité dès avril prochain
Le chantier démarrera en avril 2027 mais les échanges entre les riverains et la métropole ont débuté ce jeudi soir en vue de la requalification de la rue Saint-Dizier. À reprendre et à réaménager de fond en comble, cette longue artère sera fermée sur toute sa longueur dès le printemps, pour près de trois ans.
Further reading
Go up the thread
Affected departments