Detected on Thursday 19 November, 10h54
Alstom to cover night tests of metro line 1
Alstom will cover the financial cost of future night tests following malfunctions on metro line 1. These tests are intended to verify the restoration of the line.
In brief
Transport event (severity: low), first detected on 19 November 2026 at 10:54. Reported by 1 source (1 article), last updated on 19 November 2026 at 10:54.
·
- Category
- Transport
- Severity
- Low
- Place
- Not geolocated
- Detected
- 19 Nov, 10h54
- Updated
- 19 Nov, 10h54
- Reference
- no.25179
1Centre
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
02
Lire les sources · 1 article, 1 source
Publication order
- 10h54La Voix du NordCentreWire19 NovDysfonctionnements sur la ligne 1 du métro : Alstom assumera le coût financier des futurs essais nocturnes
03
Further reading
Go up the thread
On the same subject
People and organisations cited