Acturadar.comFrance in real time

Detected on Tuesday 27 October, 20h01

Gard: Roquemaure bridge closed for in-depth diagnostic

The Roquemaure bridge, built nearly 70 years ago, is closed to traffic while an in-depth diagnostic is carried out on its condition. It is one of 3,200 structures examined in the Gard.

In brief

Transport event (severity: low) in Roquemaure (Gard), first detected on 27 October 2026 at 20:01. Reported by 1 source (1 article), last updated on 27 October 2026 at 20:01.

·
Category
Transport
Severity
Low
Place
30 GardRoquemaure
Detected
27 Oct, 20h01
Updated
27 Oct, 20h01
Reference
no.2429
01

Who is covering it, and from what angle

Method
1Uncategorised

1 article · 1 source · no rated outlet covers this topic yet (public service, agencies, official accounts…)

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 20h01
    France 3 RégionsWire27 Oct
    Fermeture totale, caméras dans la structure et déviation : pourquoi le pont de Roquemaure est minutieusement ausculté comme 3 200 autres ouvrages d'art

    Construit voilà près de 70 ans, le pont de Roquemaure doit subir une cure de jouvence. Cet ouvrage, suspendu au-dessus du Rhône, est fermé à la circulation, le temps de dresser un diagnostic sur son état général. 3 200 autres ponts sont concernés dans le Gard.

03

Further reading

Keywords

#pont · #travaux · #circulation · #Gard

Go up the thread

Affected departments