Acturadar.comFrance in real time

Detected on Wednesday 18 November, 10h57

Fire at Couvrot cement plant with 15 to 20 day kiln shutdown

A major fire broke out in the early morning of 18 November 2026 in the coal grinding unit of the Couvrot cement plant. The damage is expected to result in a kiln shutdown of 15 to 20 days.

In brief

Disaster event (severity: notable) in Couvrot (Marne), first detected on 18 November 2026 at 10:57. Reported by 1 source (1 article), last updated on 18 November 2026 at 10:57.

·
Category
Disaster
Severity
Notable
Place
51 MarneCouvrot
Detected
18 Nov, 10h57
Updated
18 Nov, 10h57
Reference
no.23901
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 10h57
    L'UnionCentreWire18 Nov
    « Un arrêt du four de 15 à 20 jours » : un incendie provoque d’importants dégâts pour la cimenterie de Couvrot

    Lecture zen Les pompiers sont arrivés très rapidement sur le site. - Illustration Un important incendie s’est déclaré au sein de la cimenterie de Couvrot , ce mercredi 18 novembre 2026 au petit matin. Les flammes ont pris dans l’atelier de broyage de charbon – qui alimente le four – vers 7 heures. « On a déclenché nos systèmes d’extinction automatique à distance, ce qui a permis de limiter l’ampleur du sinistre. Il a ensuite été maîtrisé par les pompiers, arrivés très rapidement sur le site, que je remercie pour leur intervention » , explique Sergio Tosi, le directeur de l’usine du groupe Heid

03

Further reading

People cited

Organisations cited

Places cited

Keywords

#incendie · #cimenterie · #Couvrot

Go up the thread

Affected departments

People and organisations cited