Detected on Tuesday 17 November, 19h23
Energy renovation of social housing 'sieves' while occupied
Renovation work on social housing 'sieves' (poorly insulated homes) was carried out while occupied over 14 months. Facades, bathrooms, kitchens, windows, and shutters were fully renovated.
In brief
Society event (severity: low), first detected on 17 November 2026 at 19:23. Reported by 1 source (1 article), last updated on 17 November 2026 at 19:23.
- Category
- Society
- Severity
- Low
- Place
- Not geolocated
- Detected
- 17 Nov, 19h23
- Updated
- 17 Nov, 19h23
- Reference
- no.23215
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 19h23L'UnionCentreReport17 NovDes HLM passoires surclassés gagnent des points de vie
Lecture zen Réalisés en milieu occupé, les travaux de rénovation de la résidence se sont étalés sur 14 mois. Outre les façades, les salles de bains, cuisines, fenêtres et volets ont été entièrement rénovés. - Bruno Saussier. En ce mois d’octobre, Béatrice (*), locataire au premier étage du bâtiment n° 3, affiche un large sourire. « Chez moi, il fait 25 degrés. J’ai coupé le chauffage, et je dors la fenêtre ouverte ! En plus, avec la nouvelle épaisseur des murs, je peux mettre des fleurs sur le rebord de mes fenêtres. » Un confort tout à fait impossible il y a encore deux ans… Consultez l’actua
Further reading
Keywords
#HLM · #rénovation · #passoires · #logement
Go up the thread
On the same subject
- La Fère: thermal renovation of 153 social housing units in the city center5 Nov
- Toulon: Energy renovation of social housing at La Visitation17 Nov
- Colmar: Pôle Habitat renovates 353 homes12 Nov
- Nîmes : des locataires du quartier de Pissevin subissent les nuisances de la rénovation HLM16 Nov
- The Oliveaux bet on eliminating energy-inefficient homes7 Nov