Acturadar.comFrance in real time

Detected on Monday 16 November, 19h53

Ostwald: reopening of the M35 gas station delayed until the second quarter of 2027

The Total gas station bordering the M35 in Ostwald will not reopen before the second quarter of 2027. Work started a year ago was halted by unforeseen circumstances.

In brief

Economy event (severity: low) in Ostwald (Bas-Rhin), first detected on 16 November 2026 at 19:53. Reported by 1 source (1 article), last updated on 16 November 2026 at 19:53.

·
Category
Economy
Severity
Low
Place
67 Bas-RhinOstwald
Detected
16 Nov, 19h53
Updated
16 Nov, 19h53
Reference
no.21934
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 19h53
    Dernières Nouvelles d'AlsaceCentreWire16 Nov
    Ostwald. La réouverture de l’aire de service au bord de la M35 est repoussée

    La station-service Total d’Ostwald bordant l’autoroute urbaine (M35) n’est pas près de lever ses barrières : les travaux entamés il y a un an ont buté sur un aléa. L’entreprise annonce une réouverture au second trimestre 2027.

03

Further reading

Organisations cited

Places cited

Keywords

#station-service · #M35 · #travaux

Go up the thread

Affected departments

People and organisations cited