Detected on Saturday 14 November, 19h48
Forêt d'Orient Park: municipalities must decide before December 20
The new charter of the Forêt d'Orient Regional Natural Park is ready; the concerned municipalities, intermunicipalities and departments must vote on their integration into the perimeter before December 20.
In brief
Environment event (severity: info) in Parc naturel régional de la forêt d'Orient (Aube), first detected on 14 November 2026 at 19:48. Reported by 1 source (1 article), last updated on 14 November 2026 at 19:48.
- Category
- Environment
- Severity
- Info
- Place
- 10 AubeParc naturel régional de la forêt d'Orient
- Detected
- 14 Nov, 19h48
- Updated
- 14 Nov, 19h48
- Reference
- no.20017
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 19h48L'UnionCentreWire14 NovExtension du Parc de la forêt d’Orient : les potentielles nouvelles communes devront se décider avant le 20 décembre
Lecture zen La nouvelle charte du parc naturel régional de la forêt d‘Orient (PNRFO) est enfin prête. - Pascal Bourguignon Dans les semaines à venir, les 87 communes (les 58 communes historiques et les 29 nouvelles communes devant intégrer le périmètre), les 6 intercommunalités et les 2 départements devront se prononcer pour faire partie du périmètre définitif de ce « futur » parc naturel régional. C e fut un processus long. Un peu plus long que la normale pourrait-on dire en raison de la crise sanitaire liée au Covid-19 puis au choix présidentiel de dissoudre l’Assemblée nationale qui a entra
Further reading
Organisations cited
Places cited
Keywords
#parc naturel · #forêt d'Orient · #charte
Go up the thread
Affected departments
People and organisations cited