Acturadar.comFrance in real time

Detected on Saturday 14 November, 15h26

Nogent-sur-Seine: agreement renewed between firefighters, prefecture and nuclear plant

The Aube fire and rescue service, the prefecture and the Nogent-sur-Seine nuclear plant renewed on Thursday 12 November, for three years, their agreement on firefighting.

In brief

Security event (severity: info) in Nogent-sur-Seine (Aube), first detected on 14 November 2026 at 15:26. Reported by 1 source (1 article), last updated on 14 November 2026 at 15:26.

·
Nogent-sur-Seine

Nogent-sur-Seine

Photo François GOGLINS · CC BY-SA 4.0 · Wikimedia Commons
Category
Security
Severity
Info
Place
10 AubeNogent-sur-Seine
Detected
14 Nov, 15h26
Updated
14 Nov, 15h26
Reference
no.19819
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 15h26
    L'UnionCentreWire14 Nov
    Le Service départemental d’incendie et de secours de l’Aube, la préfecture et la centrale nucléaire de Nogent-sur-Seine poursuivent leur partenariat

    Lecture zen La convention, qui porte sur l’organisation de la lutte contre l’incendie, a été reconduite ce jeudi 12 novembre pour une durée de trois ans. La convention, qui porte sur l’organisation de la lutte contre l’incendie, a été reconduite ce jeudi 12 novembre pour une durée de trois ans. Philippe Pichery, président du Service départemental d’incendie et de secours de l’Aube, Ophélie Ragueneau-Greneau, directrice de cabinet du préfet de l’Aube, et Yannick Simonet, directeur de la centrale nucléaire de Nogent-sur-Seine, ont prolongé leur partenariat pour trois ans. Philippe Pichery, prési

03

Further reading