Acturadar.comFrance in real time

Detected on Friday 13 November, 13h24

A34: closure of ramp 4 of interchange 9 for eight days

Works to replace a restraint device lead to the closure to traffic of ramp 4 of interchange 9 on the A34 from November 16 to 24, 2026.

In brief

Transport event (severity: info) in Ardennes, first detected on 13 November 2026 at 13:24. Reported by 1 source (1 article), last updated on 13 November 2026 at 13:24.

·
Sedan

Sedan

Photo Szeder László · CC BY-SA 4.0 · Wikimedia Commons
Category
Transport
Severity
Info
Detected
13 Nov, 13h24
Updated
13 Nov, 13h24
Reference
no.18691
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 13h24
    L'UnionCentreWire13 Nov
    Autoroute A34 : une bretelle d’accès va être fermée pour travaux pendant huit jours

    Lecture zen Les travaux commencent ce lundi. - Illustration LVDN Alors que revoilà les travaux sur l’autoroute. Du lundi 16 novembre 2026, 7 heures du matin, au 24 novembre, 17 heures, des travaux de remplacement d’un dispositif de retenue vont être menés, entraînant la fermeture à la circulation de la bretelle 4 de l’échangeur 9 de l’A34, soit, en langage profane, de la bretelle d’insertion du Moulin Leblanc (Campus de Charleville) , dans le sens Charleville Mézières-Sedan. Demi-tour à la Francheville Une déviation va être mise en place le temps du chantier. Rassurez-vous, elle n’a rien de bi

03

Further reading

Keywords

#A34 · #travaux · #fermeture · #Ardennes

Go up the thread

Affected departments