Acturadar.comFrance in real time

Detected on Tuesday 27 October, 12h00

Ambonnay: wastewater treatment plant brought up to standard

The Ambonnay wastewater treatment plant, dating from 1996, no longer met regulatory standards. A buffer basin is being built to store rainwater before treatment, with completion moved up to the end of the year.

In brief

Environment event (severity: info) in Ambonnay (Marne), first detected on 27 October 2026 at 12:00. Reported by 1 source (1 article), last updated on 27 October 2026 at 12:00.

·
Category
Environment
Severity
Info
Place
51 MarneAmbonnay
Detected
27 Oct, 12h00
Updated
27 Oct, 12h00
Reference
no.1750
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 12h00
    L'UnionCentreWire27 Oct
    De gros travaux de remise aux normes à la station d’épuration d’Ambonnay

    Lecture zen Au programme, la réalisation d’un bassin tampon où vont être stockées les eaux de pluie avant d’être traitées. - FP Le chantier sera terminé plus tôt que prévu en fin d’année. - FP I l fallait se pencher au chevet de la station d’épuration d’ Ambonnay . Datant de 1996, elle n’était plus aux normes réglementaires, des rejets dans le milieu naturel y avaient été détectés. La CCGVM, communauté de communes de la Grande Vallée de la Marne, qui possède les compétences eau potable et assainissement depuis sa création en 1992, a donc engagé de gros travaux. Commencés en mai 2026, les trava

03

Further reading

Places cited

Keywords

#assainissement · #travaux · #station d'épuration

Go up the thread

Affected departments