Detected on Thursday 12 November, 19h33
Abbeville-Rue: night works on the SNCF line to replace rails
SNCF Réseau has announced rail renewal works on the Amiens-Rang-du-Fliers line, between Rue and Abbeville, from 16 November to 19 December 2026.
In brief
Transport event (severity: info) in Abbeville (Somme), first detected on 12 November 2026 at 19:33. Reported by 1 source (1 article), last updated on 12 November 2026 at 19:33.
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 19h33Paris-NormandieCentreWire12 NovAbbeville-Rue : Des travaux de nuit sur la ligne SNCF pour renouveler les rails
Les travaux sont menés sur les infrastructures. - Laurent Mayeux Mis en ligne le 12/11/2026 à 19:33 Lecture zen De nouveaux travaux sur les infrastructures sont annoncés sur la ligne Amiens - Rang-du-Fliers par SNCF Réseau. Ils débuteront le 16 novembre et jusqu’au 19 décembre 2026, entre Rue et Abbeville. À lire aussi Un million de voyageurs en gare d’Abbeville, mais sans toilettes : tous sont priés de se retenir ! Les équipes et entreprises mobilisées interviendront principalement de nuit (21 h 30 -5 heures) « afin de limiter les impacts sur les circulations ferroviaires. Plusieurs kilomètre
Further reading
Go up the thread
Affected departments
People and organisations cited