Acturadar.comFrance in real time

Detected on Thursday 12 November, 19h33

Abbeville-Rue: night works on the SNCF line to replace rails

SNCF Réseau has announced rail renewal works on the Amiens-Rang-du-Fliers line, between Rue and Abbeville, from 16 November to 19 December 2026.

In brief

Transport event (severity: info) in Abbeville (Somme), first detected on 12 November 2026 at 19:33. Reported by 1 source (1 article), last updated on 12 November 2026 at 19:33.

·
Category
Transport
Severity
Info
Place
80 SommeAbbeville
Detected
12 Nov, 19h33
Updated
12 Nov, 19h33
Reference
no.17304
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 19h33
    Paris-NormandieCentreWire12 Nov
    Abbeville-Rue : Des travaux de nuit sur la ligne SNCF pour renouveler les rails

    Les travaux sont menés sur les infrastructures. - Laurent Mayeux Mis en ligne le 12/11/2026 à 19:33 Lecture zen De nouveaux travaux sur les infrastructures sont annoncés sur la ligne Amiens - Rang-du-Fliers par SNCF Réseau. Ils débuteront le 16 novembre et jusqu’au 19 décembre 2026, entre Rue et Abbeville. À lire aussi Un million de voyageurs en gare d’Abbeville, mais sans toilettes : tous sont priés de se retenir ! Les équipes et entreprises mobilisées interviendront principalement de nuit (21 h 30 -5 heures) « afin de limiter les impacts sur les circulations ferroviaires. Plusieurs kilomètre

03

Further reading

Organisations cited

Places cited

Keywords

#SNCF · #travaux · #rails · #Abbeville

Go up the thread

Affected departments

People and organisations cited