Acturadar.comFrance in real time

Detected on Monday 9 November, 09h23

ASNR inaugurates PASTIS project research facilities at Cadarache

The Autorité de sûreté nucléaire et de radioprotection (ASNR) inaugurated the new PASTIS project facilities at its Cadarache site on November 4, 2026. The facilities are dedicated to the thermohydraulic study of passive systems.

In brief

Security event (severity: info) in Cadarache (Bouches-du-Rhône), first detected on 9 November 2026 at 09:23. Reported by 1 source (1 article), last updated on 9 November 2026 at 09:23.

·
Category
Security
Severity
Info
Place
13 Bouches-du-RhôneCadarache
Detected
9 Nov, 09h23
Updated
9 Nov, 09h23
Reference
no.13834
01

Who is covering it, and from what angle

Method
1Uncategorised

1 article · 1 source · no rated outlet covers this topic yet (public service, agencies, official accounts…)

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 09h23
    ASNR (sûreté nucléaire)Press releasevia ASNR – Sûreté nucléaire9 Nov
    PASTIS : l’ASNR inaugure de nouvelles installations de recherche pour préparer l’expertise de sûreté de demain

    PASTIS : l’ASNR inaugure de nouvelles installations de recherche pour préparer l’expertise de sûreté de demain admin lun 09/11/2026 - 09:23 Introduction Ce mercredi 4 novembre 2026, l’ASNR a inauguré sur son site de Cadarache les nouvelles infrastructures et installations de recherche du projet PASTIS (Passive Systems Thermalhydraulic Investigations for Safety). Ce mercredi 04 novembre 2026, l’ASNR a inauguré sur son site de Cadarache les nouvelles infrastructures et installations de recherche du projet PASTIS (Passive Systems Thermalhydraulic Investigations for Safety). Soutenue dans le cadre

03

Further reading

Organisations cited

Places cited

Keywords

#nucléaire · #ASNR · #sûreté · #recherche

Go up the thread

Affected departments

People and organisations cited