Acturadar.comFrance in real time

Detected on Sunday 8 November, 18h39

Haute-Savoie: fiber optic rollout delayed

According to ARCEP, Haute-Savoie is the department with the highest number of premises still to be connected to fiber optics by volume, a delay explained by several factors.

In brief

Cyber event (severity: low) in Haute-Savoie, first detected on 8 November 2026 at 18:39. Reported by 1 source (1 article), last updated on 8 November 2026 at 18:39.

·
Haute-Savoie

Haute-Savoie

Photo Camster · CC BY-SA 3.0 · Wikimedia Commons
Category
Cyber
Severity
Low
Place
74 Haute-SavoieHaute-Savoie
Detected
8 Nov, 18h39
Updated
8 Nov, 18h39
Reference
no.13418
01

Who is covering it, and from what angle

Method
1Centre

1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0

Angle comparison

A comparison is written as soon as the event is covered by at least two sides (left, centre, right).

02

Lire les sources · 1 article, 1 source

Publication order
  1. 18h39
    Le Dauphiné libéréCentreAnalysis8 Nov
    Haute-Savoie. Les cinq raisons qui expliquent pourquoi la fibre peine à arriver

    Selon le dernier relevé de l’Arcep (l’Autorité de régulation des communications électroniques), la Haute-Savoie est le département de France où, en volume de locaux raccordables à la fibre, il reste le plus de travail à fournir. Un retard bien réel mais qui a ses explications.

03

Further reading

Places cited

Keywords

#fibre · #Arcep · #Haute-Savoie

Go up the thread

Affected departments