Detected on Sunday 8 November, 11h23
Chambéry: part of Cassine roadwork project had to be demolished
In the neighborhood behind Chambéry station, a new section of the Cassine roadwork project was demolished. The project owner cites adjustments to improve traffic flow between Chambéry and the VRU.
In brief
Transport event (severity: info) in Chambéry (Savoie), first detected on 8 November 2026 at 11:23. Reported by 1 source (1 article), last updated on 8 November 2026 at 11:23.
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 11h23Le Dauphiné libéréCentreWire8 NovChambéry. « Améliorer la fluidité entre Chambéry et la VRU » : dans le quartier derrière la gare, pourquoi une partie du chantier de la Cassine a dû être détruit ?
Dans le quartier derrière la gare de Chambéry, un étrange manège a été observé sur le chantier de voirie. Une partie neuve a dû être détruite. Le maître d’ouvrage évoque des ajustements. Explications.
Further reading
Go up the thread
Affected departments