Detected on Thursday 5 November, 21h43
Valence: first stone laid for Briffaut excellence hub
The first stone of the Briffaut excellence hub was laid in Valence on November 5. The building, scheduled for completion in December 2027, will be used to train young players from VRDR, Olympique de Valence, and Valence Drôme Handball.
In brief
Society event (severity: info) in Valence (Drôme), first detected on 5 November 2026 at 21:43. Reported by 1 source (1 article), last updated on 5 November 2026 at 21:43.
1 article · 1 source · 1 bord sur 3 · outlets: left 0, centre 1, right 0
Angle comparison
A comparison is written as soon as the event is covered by at least two sides (left, centre, right).
Lire les sources · 1 article, 1 source
- 21h43Le Dauphiné libéréCentreWire5 NovOmnisports. Travaux du pôle excellence, une tribune du stade Pompidou rénovée : le sport valentinois poursuit son chemin vers les sommets
Ce jeudi 5 novembre, la première pierre du pôle excellence de Briffaut a été posée. En décembre 2027, un bâtiment flambant neuf servira à former les jeunes joueurs du VRDR, de l’Olympique de Valence et du Valence Drôme Handball dans leur quête de rejoindre le monde professionnel.
Further reading
Organisations cited
Keywords
#Valence · #pôle excellence · #sport · #travaux
Go up the thread
Affected departments
People and organisations cited