# Fibre Excellence Saint-Gaudens: liquidation and hopes of takeover

> On October 30, 2026, the future of the Fibre Excellence plant in Saint-Gaudens is called into question by a Portuguese buyer described as a "ghost". On November 12, due to the absence of a takeover offer, the Toulouse commercial court pronounced judicial liquidation and the cessation of activity at the pulp mill in Haute-Garonne. Employees are then awaiting layoff letters, planned between December 20 and 25, despite hopes of a takeover by the Ghost group. The following day, Industry Minister Sébastien Martin states that a takeover project is emerging after the liquidation. On November 17, the CGT maintains its mobilization for an industrial project and the works council must meet the judicial liquidator.

**In brief**: Ongoing story bringing together 5 events in Haute-Garonne, followed from 30 October 2026 to 17 November 2026. 31 articles from 19 sources (economy); last updated on 17 November 2026 at 07:33.

- Status: ongoing
- Category: Economy
- Place: Haute-Garonne
- First detected: 30 October 2026 at 13:56
- Updated: 17 November 2026 at 07:33
- Web page: https://acturadar.com/en/stories/573-fibre-excellence-saint-gaudens-liquidation-and-hopes-of-takeover

## Coverage angles

Left-leaning articles emphasize union mobilization, takeover prospects, and political responsibilities more, while center articles focus mainly on the judicial decision, the closure, and the number of employees concerned. The right side here is limited to the cessation of activity and the absence of a firm takeover offer.

**Common ground**

- The Toulouse commercial court pronounced judicial liquidation and the cessation of activity at the Fibre Excellence plant in Saint-Gaudens.
- Around 300 employees are concerned by the layoffs or closure.
- The decision is linked to the absence of a retained takeover offer.

**Differences**

- The left gives wide coverage to the mobilization actors and takeover leads, including the CGT, Carole Delga, the Ghost group, the Occitanie region, and Minister Sébastien Martin.
- The center focuses more on the judicial and industrial chronology, with references to Tarascon, technical liquidation since July, and the previous judicial reorganization status.
- L’Humanité, on the left, introduces a political reading of the closure by evoking the "already well-filled industrial cemetery of macronism", an angle absent from the center and right articles provided.
- Le Parisien, in the center, frames the Portuguese buyer issue as a question — "Can a Portuguese "ghost" still save the plant?" — while left-wing articles on the post-liquidation period mainly highlight takeover hopes or employee expectations.

## Timeline (5 events)

### 30 October 2026 — [Saint-Gaudens Fibre Excellence plant threatened by “phantom” buyer](https://acturadar.com/en/events/4881-saint-gaudens-fibre-excellence-plant-threatened-by-phantom-buyer.md)

The future of the Fibre Excellence plant in Saint-Gaudens is in question, with a Portuguese buyer described as a “phantom” being called into question.

5 sources, 5 articles · Saint-Gaudens — Haute-Garonne

### 12 November 2026 — [Fibre Excellence Saint-Gaudens: judicial liquidation confirmed](https://acturadar.com/en/events/17116-fibre-excellence-saint-gaudens-judicial-liquidation-confirmed.md)

Due to the absence of a takeover bid, the Toulouse commercial court pronounced the cessation of activity of the Saint-Gaudens paper pulp mill, in Haute-Garonne.

16 sources, 22 articles · Saint-Gaudens — Haute-Garonne

### 12 November 2026 — [Fibre Excellence : les salariés de Saint-Gaudens attendent leurs licenciements avant Noël](https://acturadar.com/en/events/17177-fibre-excellence-les-salaries-de-saint-gaudens-attendent-leurs-licenciements.md)

Après la liquidation judiciaire de Fibre Excellence, les salariés de Saint-Gaudens attendent des lettres de licenciement qui pourraient arriver entre le 20 et le 25 décembre, malgré l'espoir d'une reprise par le groupe Ghost.

1 sources, 1 articles · Saint-Gaudens — Haute-Garonne

### 13 November 2026 — [Fibre Excellence : le ministre de l'Industrie évoque un projet de reprise après la liquidation](https://acturadar.com/en/events/18439-fibre-excellence-le-ministre-de-l-industrie-evoque-un-projet-de-reprise-apres.md)

Après la liquidation judiciaire de l'usine Fibre Excellence de Saint-Gaudens prononcée jeudi, le ministre de l'Industrie Sébastien Martin affirme qu'un projet de reprise émerge.

2 sources, 2 articles · Saint-Gaudens — Haute-Garonne

### 17 November 2026 — [Fibre Excellence : la CGT maintient la mobilisation pour un projet de reprise](https://acturadar.com/en/events/22302-fibre-excellence-la-cgt-maintient-la-mobilisation-pour-un-projet-de-reprise.md)

Après la liquidation judiciaire de l'usine de Saint-Gaudens, la CGT refuse de baisser les bras et défend un projet de reprise industrielle. Le CSE doit rencontrer le liquidateur judiciaire.

1 sources, 1 articles · Saint-Gaudens — Haute-Garonne

---

Cite as: Acturadar, “Fibre Excellence Saint-Gaudens: liquidation and hopes of takeover”, https://acturadar.com/en/stories/573-fibre-excellence-saint-gaudens-liquidation-and-hopes-of-takeover
Methodology: https://acturadar.com/en/methodology
