# RN2: traffic and viaduct project to open up a village

**In brief**: Ongoing story bringing together 2 events in Aisne, followed from 10 November 2026 to 12 November 2026. 2 articles from 1 source (transport); last updated on 12 November 2026 at 06:33.

- Status: ongoing
- Category: Transport
- Place: Aisne
- First detected: 10 November 2026 at 06:30
- Updated: 12 November 2026 at 06:33
- Web page: https://acturadar.com/en/stories/566-rn2-traffic-and-viaduct-project-to-open-up-a-village

## Reported figures

- 60 millions d’euros

## Timeline (2 events)

### 10 November 2026 — [A €60 million viaduct must free a village from RN2 traffic](https://acturadar.com/en/events/14789-a-60-million-viaduct-must-free-a-village-from-rn2-traffic.md)

Construction of a 40-meter-high viaduct, estimated at €60 million, is intended to divert RN2 traffic away from a village. The long-awaited project is presented as a deliverance for residents.

1 sources, 1 articles · Not located

### 12 November 2026 — [A hamlet split by the RN2 and traversed by 18,000 vehicles per day](https://acturadar.com/en/events/17024-a-hamlet-split-by-the-rn2-and-traversed-by-18-000-vehicles-per-day.md)

Residents of a hamlet traversed by the RN2 are denouncing traffic of 18,000 vehicles per day and are considering leaving. They are calling for improvements.

1 sources, 1 articles · Aisne

---

Cite as: Acturadar, “RN2: traffic and viaduct project to open up a village”, https://acturadar.com/en/stories/566-rn2-traffic-and-viaduct-project-to-open-up-a-village
Methodology: https://acturadar.com/en/methodology
