# Airbus and Boeing behind on production rates

> On October 29, 2026, Airbus maintained its annual delivery target of 870 despite a mixed third quarter. The two aerospace giants posted mixed results in the third quarter of 2026 and are struggling to meet their delivery commitments. Boeing has revised down its industrial rate targets.

**In brief**: Ongoing story bringing together 2 events nationwide, followed from 29 October 2026 to 29 October 2026. 3 articles from 3 sources (economy); last updated on 29 October 2026 at 18:21.

- Status: ongoing
- Category: Economy
- Place: Nationwide
- First detected: 29 October 2026 at 08:01
- Updated: 29 October 2026 at 18:21
- Web page: https://acturadar.com/en/stories/157-airbus-and-boeing-behind-on-production-rates

## Timeline (2 events)

### 29 October 2026 — [Airbus maintains its target of 870 deliveries despite a mixed quarter](https://acturadar.com/en/events/3596-airbus-maintains-its-target-of-870-deliveries-despite-a-mixed-quarter.md)

European aircraft manufacturer Airbus maintains its target of 870 deliveries this year after a mixed third quarter.

2 sources, 2 articles · Nationwide

### 29 October 2026 — [Airbus et Boeing en retard sur leurs cadences de production](https://acturadar.com/en/events/4225-airbus-et-boeing-en-retard-sur-leurs-cadences-de-production.md)

Les deux géants de l'aéronautique affichent des résultats en demi-teinte au troisième trimestre 2026 et peinent à tenir leurs promesses de livraison. Boeing a même revu à la baisse ses objectifs de cadencement industriel.

1 sources, 1 articles · Nationwide

---

Cite as: Acturadar, “Airbus and Boeing behind on production rates”, https://acturadar.com/en/stories/157-airbus-and-boeing-behind-on-production-rates
Methodology: https://acturadar.com/en/methodology
