# Biodiversity protection and constraints for construction sites

**In brief**: Closed story bringing together 2 events in Pas-de-Calais, followed from 27 October 2026 to 29 October 2026. 2 articles from 1 source (environment); last updated on 29 October 2026 at 10:24.

- Status: closed
- Category: Environment
- Place: Pas-de-Calais
- First detected: 27 October 2026 at 07:51
- Updated: 29 October 2026 at 10:24
- Web page: https://acturadar.com/en/stories/1236-biodiversity-protection-and-constraints-for-construction-sites

## Timeline (2 events)

### 27 October 2026 — [Audomarois: protected species disrupt construction projects](https://acturadar.com/en/events/1512-audomarois-protected-species-disrupt-construction-projects.md)

In the Audomarois area, the presence of protected lizards, swifts, bats and orchids is complicating construction work.

1 sources, 1 articles · Audomarois — Pas-de-Calais

### 29 October 2026 — [A species both protected and threatened](https://acturadar.com/en/events/3697-a-species-both-protected-and-threatened.md)

Article devoted to a protected but threatened species, in connection with tensions between biodiversity protection and construction projects.

1 sources, 1 articles · Pas-de-Calais

---

Cite as: Acturadar, “Biodiversity protection and constraints for construction sites”, https://acturadar.com/en/stories/1236-biodiversity-protection-and-constraints-for-construction-sites
Methodology: https://acturadar.com/en/methodology
