# Francilly-Selency faces a wind turbine installation project

> The measurement mast installed in March 2025 has convinced a developer to install a fourth wind turbine near Francilly-Selency.

**In brief**: Environment event (severity: info) in Francilly-Selency (Aisne), first detected on 4 November 2026 at 06:06. Reported by 1 source (1 article), last updated on 4 November 2026 at 06:06.

- Category: Environment
- Severity: Info
- Place: Francilly-Selency — Aisne
- First detected: 4 November 2026 at 06:06
- Updated: 4 November 2026 at 06:06
- Web page: https://acturadar.com/en/events/8880-francilly-selency-faces-a-wind-turbine-installation-project

## Sources (1 articles)

- [La commune de Francilly-Selency risque de céder à son tour aux sirènes des éoliennes](http://www.paris-normandie.fr/id756988/article/2026-11-04/la-commune-de-francilly-selency-risque-de-ceder-son-tour-aux-sirenes-des) — Paris-Normandie, 4 November 2026 at 06:06

---

Cite as: Acturadar, “Francilly-Selency faces a wind turbine installation project”, https://acturadar.com/en/events/8880-francilly-selency-faces-a-wind-turbine-installation-project
Methodology: https://acturadar.com/en/methodology
