# Toulouse: Line C tunnel boring machine arrives at Lycée Toulouse-Lautrec station

> The tunnel boring machine Berthe de Puybusque reached Lycée Toulouse-Lautrec station after 1,100 meters of drilling, a new stage in the construction of Line C of the Toulouse metro.

**In brief**: Transport event (severity: info) in Toulouse (Haute-Garonne), first detected on 3 November 2026 at 08:11. Reported by 1 source (1 article), last updated on 3 November 2026 at 08:11.

- Category: Transport
- Severity: Info
- Place: Toulouse — Haute-Garonne
- First detected: 3 November 2026 at 08:11
- Updated: 3 November 2026 at 08:11
- Web page: https://acturadar.com/en/events/7917-toulouse-line-c-tunnel-boring-machine-arrives-at-lycee-toulouse-lautrec-station

## Sources (1 articles)

- [Chantier du métro à Toulouse : une nouvelle étape franchie avec l'arrivée du tunnelier à la station Lycée Toulouse-Lautrec](https://www.ladepeche.fr/2026/11/03/chantier-du-metro-a-toulouse-une-nouvelle-etape-franchie-avec-larrivee-du-tunnelier-a-la-station-lycee-toulouse-lautrec-13633153.php) — La Dépêche du Midi, 3 November 2026 at 08:11

---

Cite as: Acturadar, “Toulouse: Line C tunnel boring machine arrives at Lycée Toulouse-Lautrec station”, https://acturadar.com/en/events/7917-toulouse-line-c-tunnel-boring-machine-arrives-at-lycee-toulouse-lautrec-station
Methodology: https://acturadar.com/en/methodology
