# Ain: Grosfillex joinery recovery plan hinges on hiring

> After the company was bought out, the Montréal-la-Cluse site is running at full capacity while the Arbent site is on partial unemployment.

**In brief**: Economy event (severity: low) in Montréal-la-Cluse (Ain), first detected on 2 November 2026 at 17:00. Reported by 1 source (1 article), last updated on 2 November 2026 at 17:00.

- Category: Economy
- Severity: Low
- Place: Montréal-la-Cluse — Ain
- First detected: 2 November 2026 at 17:00
- Updated: 2 November 2026 at 17:00
- Web page: https://acturadar.com/en/events/7270-ain-grosfillex-joinery-recovery-plan-hinges-on-hiring

## Sources (1 articles)

- [Ain. « On est revenu dans le jeu » : Le plan de relance de Grosfillex menuiseries passe par des embauches](https://www.ledauphine.com/economie/2026/10/28/on-est-revenu-dans-le-jeu-le-plan-de-relance-de-grosfillex-menuiseries-passe-par-des-embauches) — Le Dauphiné libéré, 2 November 2026 at 17:00

---

Cite as: Acturadar, “Ain: Grosfillex joinery recovery plan hinges on hiring”, https://acturadar.com/en/events/7270-ain-grosfillex-joinery-recovery-plan-hinges-on-hiring
Methodology: https://acturadar.com/en/methodology
